Residential Solar

Please Refer to the Links and Guides for Residential Solar
Residential Solar ChecklistElectronic Submittal Guide
Solar APP+ Informational Guide

Licensed Contractors Self Service Permits
Licensed contractors can now submit:
Using SolarAPP+
Step 1: Eligibility to Use SolarAPP+
Step 2: Submit for Automated Review Through SolarApp+
Step 3: Obtain a City of Turlock Permit
Step 4: Schedule Your Inspection
- Field solar representative shall verify the inspection checklist and sign the document confirming completion prior to inspection.
- Requests for Building Inspections made before 4:00 pm Monday through Friday will be scheduled for the following workday.
- Any requests received after 4:00 pm will be scheduled for the 2nd day following the call.
- Call in for inspections at 209-668-5542 *2223 You will be directed to leave a message for your inspection. Please leave the following information:
- Permit Number (for example, BP# 25-1234)
- Job site Address
- Type of Inspection Requested
- Day (Date) you are requesting the inspection to be carried out
- Leave the job site contact person’s phone number in case the inspector needs it.
- Any special instructions such as lockbox information, etc.
- The Permit, SolarApp+ Approval Document, and Inspection Checklist and specifications must be printed for inspection and at the job site at all times for inspection purposes.
- A reinspection fee will be applied if work is not ready or if the Permit and Approval documents are not printed and at the job site or if revisions are not completed via SolarApp+ prior to scheduling an inspection.
- To cancel an inspection, call the Building Division at 209-668-5560 immediately.
- ANY proposed changes to previously approved plans shall be submitted for review/approval, prior to doing the work and prior to scheduling an inspection, and a plan change fee shall be assessed.
- Submit your revision through SolarAPP+ first: Solar APP+ website
- Follow Steps 2, 3, and 4 above.
- You will be provided with a revised SolarAPP+ Approval Document and Inspection List.
- Download and Print your Approval Document, Inspection List, and permit documents.
- If the scope of the revision makes the project ineligible for use of SolarAPP+, please Contact the Building Department at (209) 668-5560 or at building@turlock.ca.us to coordinate the revision submittal process.
- What is SolarAPP+
- What projects qualify to be submitted in SolarAPP+?
- IREC Training Classes
SolarAPP+ Revisions
SolarAPP+ Tutorials and FAQs
Details about the SolarApp are available in the following:YouTube Instructional Video
Links:
Building permit searchBuilding permits
Inspections